The miss: the winback flow restarted three weeks late. That is a scheduling failure on our side, not a market story. It carries into July as commitment C-01.
A month that doesn’t close stays open forever.
The miss: the winback flow restarted three weeks late. That is a scheduling failure on our side, not a market story. It carries into July as commitment C-01.
Retire the founder approval bottleneck
Discount authority table live since Jun 3. Founder approvals: 6 in June, all top-tier by design. CX resolution time no longer tracks the founder’s travel schedule.
One source of truth per metric
Metric dictionary now covers 9 of 12 core metrics. CAC reports from one source as of Jun 16; the wholesale feed filter is fixed. Remaining three metrics land in July.
Restart the repeat-purchase program
Post-purchase flows audited and pruned. The winback flow slipped to Jul 15. This is the same miss as the repeat-rate number above; one root cause, reported once.
The launch checklist got skipped under deadline pressure — gate held at step 7.
Steps 1–6 ran from memory on a compressed timeline. The step-7 gate caught an offer mismatch between the email and the landing page before send. Nothing reached a customer.
The checklist moves inside the send tool as a hard gate in July (commitment C-03). Skipping becomes impossible, not discouraged.
A close with zero process failures is not a clean month. It is a month nobody looked.
Set CX refund authority at $75, no escalation
Jun 10 · decided by: founder, once · runs with: CX lead · revisit: Sep 10
Kill the wholesale pilot
Jun 18 · decided by: founder · wind-down owner: ops manager · closed, no revisit
Cut the fall line to 48 SKUs
Jun 26 · decided by: head of merch · revisit: Aug 15, against sell-through
Reopened decisions in June: zero. The register holds. Full entries, rationale, and revisit dates live in the Decision Register; the close references, it never duplicates.
Supplier lead times stretched from 45 to 60 days in June. The Q4 buy must be locked by Jul 25 or air freight eats the margin the quarter just earned.
Watch owner: ops manager · on the July agenda as C-023PL reconciliation SOP written and tested Jun 24, with the holder out of the room. Escalation authority moved to CX. Residual exposure: inventory planning, until the half-seat fills.
Watch owner: founder · retires when the planner seat is filled2 findings repaired, 1 new accrued — net paydown.
Est. monthly interest: $43.0K/mo · net change −$4.3K/mo · demo data, estimates
Winback flow live and measured
Owner: retention manager · live by Jul 15 · scored by: repeat order rate on the July close
Q4 buy locked with 60-day lead times priced in
Owner: ops manager · locked by Jul 25 · scored by: zero air-freight line items in Q4 plan
Launch checklist installed as a hard gate in the send tool
Owner: web lead · done by Jul 31 · scored by: zero from-memory launches in July
Every commitment from the June close gets a kept-or-missed verdict on the July close. Nothing drops silently.